Cunninghams Gap

WHAT VALUE WAS ADDED FOR THE CUSTOMER

  • Height Dynamics Industrial Rope Access Operators
    were able to promptly mobilise and create a safe
    rope system for Smec Geotechnical Engineers to
    inspect the unstable slope and design a suitable
    stabilisation system to minimise future dislodging
    of rocks and boulders.
  • Due to the preliminary safety work performed by
    Height Dynamics, Rix Group Contractors were able
    to drill and rock bolt remaining batter, minimising
    potential future landslips to the busy highway below.
  • As the work was in a remote area with no emergency
    services available onsite or in the near vicinity, Height
    Dynamics also provided the required high angle rescue
    capability to safely evacuate a worker to grade level in
    the unfortunate event of a work-at-height emergency
  • CUSTOMER NAME

    Hazell Brothers

  • LOCATION

    Cunninghams Gap —
    Cunningham Highway

  • SCOPE OF WORKS

    Identify and scale high-risk boulders
    and vegetation which have potential
    to cause injury or death to any
    passing motorists.

  • OUTCOMES

    Height Dynamics operators
    established roped access systems to
    enable the scaling of the identified
    boulders, unstable earth and loose
    vegetation resulting in a clear work
    landscape for contractors.