Cunninghams Gap
WHAT VALUE WAS ADDED FOR THE CUSTOMER
- Height Dynamics Industrial Rope Access Operators
were able to promptly mobilise and create a safe
rope system for Smec Geotechnical Engineers to
inspect the unstable slope and design a suitable
stabilisation system to minimise future dislodging
of rocks and boulders. - Due to the preliminary safety work performed by
Height Dynamics, Rix Group Contractors were able
to drill and rock bolt remaining batter, minimising
potential future landslips to the busy highway below. - As the work was in a remote area with no emergency
services available onsite or in the near vicinity, Height
Dynamics also provided the required high angle rescue
capability to safely evacuate a worker to grade level in
the unfortunate event of a work-at-height emergency
-
CUSTOMER NAME
Hazell Brothers
-
LOCATION
Cunninghams Gap —
Cunningham Highway -
SCOPE OF WORKS
Identify and scale high-risk boulders
and vegetation which have potential
to cause injury or death to any
passing motorists. -
OUTCOMES
Height Dynamics operators
established roped access systems to
enable the scaling of the identified
boulders, unstable earth and loose
vegetation resulting in a clear work
landscape for contractors.