fbpx

Onsite Compliance

WHAT VALUE WAS ADDED FOR THE CUSTOMER

  • Low visual impact facade access system to
    residents and local community
  • Cost efficiencies as the installed Industrial Rope
    Access System eliminates the need for installation
    of expensive intrusive temporary scaffolding for the
    facade cleaning and painting project.
  • Painting project efficiencies as facade access can be
    achieved by tradespersons easily.
  • Limited interaction and disruption to the building
    occupants during facade works.
  • A permanent access system which can be used in
    years to come when further building maintenance is
    required (Window cleaning)
  • CUSTOMER NAME

    Leisuretex Painting

  • LOCATION

    Brisbane inner city

  • SCOPE OF WORKS

    Provide safe access to building
    facade for cleaning and protective
    coating.

  • OUTCOMES

    Height Dynamics installed a Sayfa
    Industrial Rope Access anchor
    system to be utilised by abseiling
    technicians to undertake facade
    maintenance works.

    The access system installed posed
    little impact to the building roof
    structure as a surface mounted
    system was utilised which was
    fixed to the roof sheeting with a
    structural riveting system