Intebuild
THE PROJECT IN DETAIL
Height Dynamics refurbished Intebuild’s plant areas as part of a
complete roof replacement project, installing a walkway, platforms
and handrails to improve height safety in the maintenance work
space.
In doing so, we applied the hierarchy of hazard control — a widely
accepted industry system that’s used to minimise or eliminate
exposure to hazards
THE HAZARD CONTROLS IN THE HIERARCHY ARE, IN ORDER OF DECREASING
EFFECTIVENESS:
- Elimination
- Substitution
- Engineering controls
- Administrative controls
- Personal protective equipment
In this case we were able to apply the highest level of control to
maintenance areas, installation of walkway, platforms to create
safe access to mechanical services and eliminate the risk of slips,
trips and falls.
As well as reducing the likelihood of accident or injury it prevents
the chance of damage to roof during maintenance.
-
CUSTOMER NAME
Intebuild
-
LOCATION
342 Wickham St
-
SCOPE OF WORKS
Scope, design and install systems
to ensure safe access to all rooftop
plant areas -
WHAT VALUE WAS
ADDED FOR THE
CUSTOMERRisk of slips, trips and falls during
rooftop maintenance has been
eliminated while raised walkways
also prevent roof damage. -
OUTCOMES
Staff and contractors now have
safe, user-friendly access to all
work areas, reducing the likelihood
of accident or injury occurring